Home / Blog

Blog

Technical writing Articles on panel selection, installation and regulation.
Sandwich Panels Featured

What is a sandwich panel, and which one goes on which building?

A sandwich panel is an envelope element with an insulation core pressed between two metal sheets. Core, profile and thickness are three separate decisions, made according to what the building is.

Read more →
Sandwich Panels

TRIPAN panel: a roof envelope with a laminated PVC membrane

In a TRIPAN panel the PVC membrane is laminated to galvanised steel at 220 degrees Celsius on a separate line. The membrane is not a layer stuck on afterwards; it becomes one layer with the steel.

Read more →
Sandwich Panels

The solar compatible roof panel and the job of the five-rib profile

On a roof carrying a solar plant the panel does two jobs: it is the envelope and it carries the modules. The five-rib profile is what makes the second job possible; the rib height is 37 mm.

Read more →
Sector

Wherever the steel comes from, four things to check

Where the steel comes from changes the lead time and the continuity of supply; its performance is set by four figures. Steel thickness, coating class, colour and traceability.

Read more →
Sandwich Panels

What does the TRIPAN roof panel change on a low-pitch roof?

TRIPAN is a five-rib roof panel with a PVC laminated outer sheet. Rib height 37 mm, panel length up to 15.5 metres; in practice it removes the need for a concealed gutter.

Read more →
Sector

What does innovation actually look like in the panel sector?

Innovation in panels is not a new slogan but a problem solved in the section. Hybrid cores, membrane laminated roofs, solar compatible profiles and perforated acoustic sheets each answer a problem from the field.

Read more →
Sector

Changing trends and customer expectations in construction

The panel buyer's question changed in a decade. Annual energy cost, a certified fire class and the delivery schedule took the place of the price per square metre; the test report is now asked for with the quotation.

Read more →
Sector

Panel selection without a specification: five lines to write

Without a specification the decision is made on site, and the decision on site is whatever is to hand. A five-line technical description saves the project from that point.

Read more →
Quality Management

What documents quality in panel manufacturing?

Quality is not a slogan but a documented chain: EN 14509 for the product, EN 13501-1 for the fire class, and ISO 9001, 14001 and 45001 on the system side. A performance value with no document counts as unwritten.

Read more →
Sector

The right product for the project: six questions that decide the panel

Panel selection starts with the conditions, not the product. Fire class, target U-value, span and load, humidity, appearance and panel length; six answers narrow the catalogue to one product.

Read more →
Industrial Products

What does after-sales support mean for a sandwich panel?

After-sales support on panels is five concrete headings: correct loading, undamaged delivery, a joint detail valid on site, maintenance after installation and the document file. All five are discussed before the order.

Read more →
Sandwich Panels

Tolerance in panels: why two quotations may not be the same product

The difference between two panels that look alike is hidden in the steel thickness, the core density and the declared values. Tolerance is not a defect; an undeclared tolerance is.

Read more →
Sandwich Panels

What really sets installation speed?

Installation speed comes from planning more than from the panel. Panel length, cover width, the screw system, the delivery order and a ready joint detail are all decided at the order stage.

Read more →
Sandwich Panels

Which number measures insulation performance?

The insulation of a panel is measured not by the thermal conductivity of the core but by the thermal transmittance of the section. They are different numbers, and the second one decides.

Read more →
Sandwich Panels

The structural capacity of a panel: span, load and service life

The load capacity of a panel comes from the steel, the rib geometry and the core making the two sheets work together. Spans are chosen from the load table, not estimated.

Read more →
Sandwich Panels

Fire and panels: class and resistance are not the same thing

Fire class is the reaction of a material to fire; fire resistance is the resistance of a building element in minutes. They look to separate standards, and confusing them in a specification stops the project at the permit stage.

Read more →
Sandwich Panels

Where is the environmental impact of a panel decided?

In the environmental balance of an envelope, the largest item is not production but the energy the building spends over its life. The thickness decision is therefore an environmental decision.

Read more →
Sandwich Panels

The cost of a sandwich panel has four parts

The cost of a panel is not its price per square metre. The panel, the installation, the difference in the structure and the energy paid over the life of the building; the fourth is often the largest.

Read more →
Sandwich Panels

The advantages of a sandwich panel: insulation, installation speed and one-piece length

The advantage of a sandwich panel is that it takes the insulation inside the envelope. Insulation on site stops being a separate trade, and a one-piece length ends the joints on the roof.

Read more →

Get a quote